| TanirTech Eng. Services | Status |
| Installation | Finished- February 2015 |
|
Eng Design along with Codificationof "DGInterconnectionAnalysis" Report |
Completed - September 2014 |
| Operation | March 2015 |
| Maintenance and Repair | March 2015 |
Project Specification
Project Features
|
|

